ECMOT

posted Mar 19, 2011, 1:03 AM by Hamish Dobson
Last Sunday and this Saturday a wall was built so the future lockable area now has a door and four walls (only up to 2.4meters on one side). The classroom requires removal of the metal shelving to storage, cleaning, sanding and painting of the walls, removal of the spare carpet and installation of wall shelving for display of radios for the ECMOT open day.
 The lockable area requires whatever lining shelves and benches are considered necessary and a ceiling hopefully waterproof.
 The museum committee in preparation for the open day have blocked off the door to the computer/ bench classroom and the area between the two classrooms containing some of the non radio equipment removed from the classrooms 