Peter, Ian, Ric and myself were there for around two hours. Staples were removed from part of the classrooms ceilings, the lining and most of the timber from the blocked up doorway, A replacement door and frame were located and the future lockable area cleared of all the timber and the sink bench unit. |
News Posts >