Thanks to Alan who arranged it all, Rolly who machined clamps and bolts and lent us the tools, and Ian who spent the afternoon doing the work while I assisted, all the equipment along with the permits etc is now ready, I hope, for the re-sitting of the aerial pole for 690 and the digi. Hopefully the weather will allow the work to proceed soon. ZL2HC |
News Posts >